OUR ACHIEVEMENTS |
---|
Year 1999
Successfully acquired and supplied a 16" Globe Valve (Value US $45,000) to Petroleum Development Oman (PDO) on "RUSH" basis within 61⁄2 Weeks as against a normal delivery time of 14 to 16 Weeks. |
Year 2000
Supply of entire Bill of Quantities for piping requirements of Emirates Lube Oil Plant in Sharjah Port to the value exceeding AED 500,000 |
Year 2001
Approved suppliers for Flame Arrestors required at various phases of ADNOC FOD Product Pipeline on roads where it intersects on ABU DHABI – AL AIN – KHALIFA TOWN truck routes. Our Branded Threaded Pipe Fittings "LAME" from Italy becoming exclusively approved by Etisalat for all their new state of the art FM200 Fire-Fighting Systems in their Buildings. Besides, these fittings are also widely used in various oil projects in the UAE, today. |
Year 2002
Successfully supplied Pipes & Pipe Fittings and specialized expansion joints for their 4 new vessels built by Abu Dhabi Ship Building in lead time of less than 60 days. We remain as one of their preferred supplier to date for their regular and daily consumables. |
Year 2003
Supplied 48" Carbon Steel Pipes and Structural Steel for the Qatif Downstream Pipelines Project to ARAMCO Contractors at Dammam in Saudi Arabia. Supplied special Valves with Monel Trim to Deutsche Babcock Borsig Power for their GASCO project for Disposal Well at ASAB/Buhasa. Also supplied Pipe Fittings and Stainless Steel Flexible Joints for the Conference Palace Hotel (known today as Emirates Palace Hotel) at Abu Dhabi Corniche through various contractors i.e. Voltas International, Tyco, Al Suwadi Engineering, etc. |
Year 2004
Supplied Pipe Fittings and Valves for the Abu Dhabi Airport Expansion Project. Executed orders worth AED 3 Million for the supply of Stainless Steel Pipes and Pipe Fittings for the Qatar Water and Electricity Authority works in Doha. |
Year 2005
Supplied Pipe Fittings and Valves for the Toshiba Projects in Umm Al Naar and Jebel Ali worth AED 2.5 Million. Supplied Structural Steel for the new Qatar Airport Project worth AED 500,000. Also supplied Heat Exchanger Tubes for Qatar Steel Company worth AED 1 Million. |
Year 2006
Appointed as an authorized distributor of FILTERATION SYSTEMS – U.S.A. for Liquid Filtration Solutions. And also authorized agent of RHINOFLEX – U.K for Flexible Connectors & Hoses. |
Year 2007
We have completed project supplies for a Gas Turbine Installation in Ras Abu Fontas for QWEC, Qatar. Our scope of supply was for Piping Materials which included CS & SS Pipes, Fittings and Valves up to 24", Pumps, Expansion Bellows, and various sundry items which were procured from various approved manufacturers. |
Year 2008
1. District Cooling Project Supplied Steel Piping up to 42" on fast track basis, including Pipes, Buttweld Fittings, and Flanges & O – lets to various contractors. Materials were supplied for: a. TABREED - UAE University - AlAin - Al Manar Mall - Ras Al Khaimah - Central Market Development - Abu Dhabi City - Dubai Metro Scheme b. Al Raha Distribution Phase 1 c. PAL Technology - Najmat Abu Dhabi Development on Al Reem Island, Abu Dhabi UAE. d. EMPOWER Dubai Supplied Steel Piping up to 36" for Piping Network and Temporary Plants and Energy Transformer Systems Stations for the following Projects: - IMPZ (Intl Media Prod. Zone) - Dubai Studio City - Global Village - Business Village in Clock Tower - Dubai Outsourcing Zone - Knowledge Village - Jumeirah Beach Residence – Network and ETS stations. e. York / Johnson Controls - Dubai Investment Park. 2. Power Sector Supplied for SS Piping (10" Smls SS316L Sch.80, 300mts) in 2 weeks. CS Piping including Fittings, Flanges, Valves and various Electrical Accessories & Structural Steels for QWEC Mesaieed Projects in Qatar. 3. Building Construction a. Capital Plaza Development Project Supplied CS Flanges in BS 4504 in PN 25 rating in sizes up to 24"within 60 days. b. Beacon School Phase 2 Supplies of CS Piping including Pipes , Fittings & Valves for HVAC and fire fighting systems. 4. Fire Fighting Projects Supplied of Steel Piping & Forged Steel Fittings for FM – 200 + Argonite Automatic Fire Suppression Systems for various Projects. a. ADNOC – Takreer Research Center at Sas Al Nakheel Proj. # 5982. b. TAKREER – Abu Dhabi Refinery Ref. 56.06.023 for Halon Line replacement Project. c. Abu Dhabi Airport Co. (ADAC) – FM 200 Automatic Fire Suppression Systems for Airport Substations. d. ADWEA – FM 200 Automatic Fire Extinguishing Systems. e. GAMCO – FM – 200 Automatic Fire Suppression systems for Archive Rooms. 5. ADNOC Distribution - Supplied Pipe Fittings for 200 nos. storage tank 5000 gallons. |
Year 2009
Industrial Projects
1. Qatalum Aluminum Smelter Plant in Qatar
2. Limestone Project – Qatar
3. Ras Laffan Olefin Project – Qatar
4. Borouge 2 Polyolefins Project Ruwais (UAE) – HVAC Works EPC
5. Tabreed Cooling Project
6. Building Construction
7. Jebel Ali Power and Desalination "M" Station
8. Dolphin Project – Taweelah – Fujairah Gas Pipeline
9. Emirates Steel Plant Unit 1 & 2
10. J00804 Aqua Orbis "A Life Fish Aquatic Plant" Project |
Year 2010
1. Lagoona Beach Hotel – Ajman
2. J00804 Aqua Orbis "A Life Fish Aquatic Plant" Project
3. J00816 Tabreed Cooling Plant – Shams 01 |